← Back to Search
closed Works
Ireland – Electrical installation work – St. Oliver Plunkett National School, Newcastle, Athenry, Co. Galway - Mechanical and Electrical Upgrade Works
Estimated Value €195,000
Published 30 Apr 2026
Deadline 27 May 2026, 14:00
Description
The existing original school building was constructed in 1977, with a classroom extension added between 2010 and 2013, including an additional classroom extension in 2025, with a total floor area of approx. 732 sq. metres and comprises of 7 number mainstream classrooms, General Purpose room, staff room, kitchen, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out consist of the stripping out, removal and proper disposal of the redundant LPHW Space heating installation in the original 1977 building, including the existing cold water storage facility and the existing boiler house installation. The project also includes the provision of general power associated with the proposed LPHW Space heating upgrade works, the provision of a new emergency lighting and fire alarm installations. The remainder existing electrical installation shall be retained, including the existing Solar PV system.
Classification
CPV Code
Spend Category
Threshold Level
Procedure Type
Source Information
Source
Reference
Platform