← Back to Search
open Works

Ireland – Road construction works – The South East Greenway – Lot 4

Estimated Value €0
Published 2 Sept 2026
Deadline 1 Oct 2026, 16:00

Description

This project involves the construction of Lot 4 which mainly entails 1.5kms of greenway in the Mountelliott townsland, north of New Ross. This is part of the South East Greenway and includes the following works; • Rehabilitation works to the Red Bridge, including removal of existing tracks and decking, repair works where specified, installation of new Greenway deck system, lighting, fencing and guarding etc. • Earthworks to the existing embankment between the Red Bridge and Mount Elliott Lane. • Rehabilitation works within Mount Elliott Tunnel. • Construction of a new bridge structure spanning Mount Elliott Lane with piled foundation supports. • Construction of ramped access to the North of the Mount Elliott tunnel from the Greenway corridor to the R700. • Construct the Greenway Lot 4 Section pavement in accordance with Works Requirements, along with all ancillary works including site clearance, landscaping, finishes, fixtures and fittings, drainage, fencing, lighting, adjacent landowner accommodation works, and all public pedestrian and cyclists infrastructure as specified.

Classification

CPV Code
Spend Category
Threshold Level
Procedure Type

Source Information

Source
Reference
Platform