← Back to Search
open Works
Ireland – High voltage installation work – D20/CON/1189B Design, Supply and Jointing works for 220 kV oil-filled to XLPE Transition Joints for the Inchicore – Poolbeg 2nd Circuit of 220 kV circuit at Inchicore 220 kV Substation
Description
CON 1189B - Design, Supply and Jointing works for 220 kV oil-filled to XLPE Transition Joints for the Inchicore – Poolbeg 2nd Circuit of 220 kV circuit at Inchicore 220 kV Substation
Classification
CPV Code
Spend Category
Threshold Level
Procedure Type
Source Information
Source
Reference
Platform