← Back to Search
awarded Works
Ireland – Construction work – Shannon Harbour Hard Edge
Description
The proposed Works involve stripping of the existing canal bank for the length of the proposed jetties, driving timber piles into the canal edge and bank, construction of timber jetties including bank supports and bracing, installation of service bollards with associated utility works, construction of connecting access pathways and landscaping.
Classification
CPV Code
Spend Category
Threshold Level
Procedure Type
Source Information
Source
Reference
Platform