← Back to Search
awarded Works
Ireland – Construction work – Suirside Carpark Clonmel EV Charging Pilot Project
Description
Design, supply, installation, commissioning, operation and maintenance of an Electrical Vehicle (EV) charging hub for 6no. perpendicular vehicular charging spaces (2no. DC and 4no. AC) within the existing Suirside public carpark in Clonmel town centre to the required design standards which will include: Destination EV charger – 1 no. 200KW Direct Current (DC) Dual Charging Unit to be designed under ZEVI Universal Design Guidelines. Neighbourhood EV Chargers - 2 no. 22KW Alternating Current (AC) Dual Charging Units located within EV Enabled Parking Spaces. A power ducting supply (approx. 120m) from the new EV Charging Station to the nearest ESB substation (as per ESB networks specifications) All associated civil and electrical works, surfacing reinstatement as per the RMO purple book requirements.
Classification
CPV Code
Spend Category
Threshold Level
Procedure Type
Source Information
Source
Reference
Platform