← Back to Search
awarded Works
Ireland – Lift installation work – Provision of Clongriffin Lift Replacement and Maintenance
Description
1. Removal of existing lift within the existing lift core and replacement with a new lift in the existing lift core at Clongriffin Station Access Location. 2. Regular maintenance of the new lift for a period of 5 years. 3. Operating lift fault monitoring system and Lift Passenger Call system for a period of 5 years.
Classification
CPV Code
Spend Category
Threshold Level
Procedure Type
Source Information
Source
Reference
Platform