← Back to Search
open Works

Ireland – Construction work for houses – Ard Caher Phase 2, Louisburgh – A659

Estimated Value €0
Published 11 Dec 2025
Deadline

Description

The development of 13 houses on a site of 0.74 hectares located to the rear of the existing (phase 1) Ard Caher housing estate, include all ancillary site works, summarised as follows: - Relocation of existing overhead utilities including undergrounding of ESB lines and new ESB poles. - Site clearance including removal of existing trees, gorse and bushes. - Removal and segregation of mixed debris, waste and rubble tipped on the site to a licenced landfill facility by a licenced haulage contractor - Removal of inert soil and rock material excavated from site to a licenced landfill facility by a licenced haulage contractor - Diversion of existing open drains flowing through the site and the construction of a new storm water pipework and attenuation system - The construction of 6 no. 4 bedroomed two storey end-of-terrace houses - The construction of 7 no. 3 bedroomed two storey terraced houses - The construction of new access road, car parking and green space. - A mixture of timber palisade and blockwork boundaries - Site development and surfacing works such as roads, paths and parking set to relevant falls. - New connections to public utilities for all units including Electricity, Telecoms, Water, Sewers, Storm drainage along with the provision of new street lighting and outlets for Electric Vehicle charging

Classification

CPV Code
Spend Category
Threshold Level
Procedure Type

Source Information

Source
Reference
Platform