← Back to Search
awarded Works
Ireland – Ground investigation work – M4 Westbound Bus Priority Measures - Ground Investigation
Description
The proposed works include Ground Investigation within the M4/N4 Westbound Bus Priority Measures Project extents along the existing M4/N4 corridor between Junction 5 Leixlip and Junction 7 Maynooth along with adjacent lands and roads within a defined boundary. The total area to be made available for the ground investigation works lies with the scheme boundary and includes the motorway corridor and adjacent junctions. The section under consideration for this commission is approximately 7.8km in length and the majority of proposed works under this contract are located close to the existing road infrastructure.
Classification
CPV Code
Spend Category
Threshold Level
Procedure Type
Source Information
Source
Reference
Platform