← Back to Search
awarded Works
Ireland – Demolition, site preparation and clearance work – Murphy Floods Site Demolition Works Contract
Description
-Demolition of all existing structures on the site. - Removal and safe disposal of all materials on the site. the site is to be left free from all materials. Following demolition, the contractor is to undertake a topographical survey of the finished site. - Undertake Visual structural inspections of perimeter buildings, roads, and footpaths, to verify no damage has occurred to surrounding properties, roads, and footpaths.
Classification
CPV Code
Spend Category
Threshold Level
Procedure Type
Source Information
Source
Reference
Platform