← Back to Search
awarded Works
Ireland – Secondary school construction work – Alterations and Extension to Presentation Secondary School, Warrenmount, Dublin 8,
Estimated Value €1,792,800
Published 17 Jun 2026
Deadline —
Description
Proposed demolition of existing Boiler Room to rear yard and provision of a standalone single storey structure consisting of a Single Classroom Special Education Unit (proposed floor area = 223sqm) to the rear yard of the existing School (existing School overall floor area = 2623sqm), external glazed canopy connecting back to main school with new enclosed external soft play area and provision of a standalone single storey Maintenance Room to front yard (proposed floor area = 13sqm), provision of new single storey Boiler Room to the side of current school (proposed floor area = 12sqm), works to modify and widen the existing gated vehicular entrance and provide a new gated pedestrian entrance to existing public footpath, together with all associated site works.
Classification
CPV Code
Spend Category
Threshold Level
Procedure Type
Source Information
Source
Reference
Platform