← Back to Search
open Works
Ireland – Construction work – Trinity Research Labs Deep Retrofit, Energy Efficiency and Decarbonisation and Fit Out Works
Estimated Value €6,900,000
Published 5 May 2026
Deadline —
Description
The Proposed Works will deliver the fit out of the existing buildings to provide sustainable, world class research facilities with improved accessibility and inclusivity. The Project will include significant fabric and service upgrade works to Units 1, 2, 3 and 8 as well as fit-out works to Units 2 ,3 and 8. Unit 1 is currently under construction as an Aerospace research facility, Unit 2 is proposed to be repurposed as a world class Water Suite, Unit 3 is proposed to be a Human Research Facility with flexible and adaptable spaces, Unit 8 which is located at that level will be repurposed into a Data Analysis and Modelling Lab and made accessible by provision of a lift.
Classification
CPV Code
Spend Category
Threshold Level
Procedure Type
Source Information
Source
Reference
Platform